Mine Survey Plus have been involved with the Havieron Copper-Gold mine exploration decline project from the start. Our surveyor set up the project grid and pegged the dune crossings to access the box cut. We then applied our specialised technology/methodology to deliver to the clients specifications for the challenging underground...
Full ArticleIn December the Team headed in the bush to lay out aerial targets for a client. A lot of fun was had along the Holland Track in the two days, with 1200km of dirt road driving completed to lay out the 11 targets for some large scale mapping. The team found...
Full ArticleThe new DJI P1 payload is a absolute game changer for the UAV based aerial surveying space. Our Chief Pilot Matt Jones recently put our M300 and P1 through its paces out the back of Kalgoorlie and the results were impressive. Using the DJI D-RTK2 base, our results on GCP’s (as check points...
Full ArticleThis project racked up our 204th kilometre of resurvey delivered using our tried and proven methodology of combining a braced one way traverse, lots of redundancy, gyroscopic observations and processing through least square adjustment. This survey was just short of 5km in total, with 454 stations, 33,000 observations and 6...
Full ArticleYour message is successfully sent...
Something went wrong